
Hiltz Propane - Modular In-Plant Office
24'x20' modular office space with integrated HVAC and electrical, providing private workspace within active propane distribution facility.
- System
- Modular Buildings & Mezzanines
- Project site
- Marietta, PA
The project, in one minute.
Hiltz Propane needed additional office space and a conference room inside their existing manufacturing facility, installed quickly. Reynolds installed a 24' x 20' modular wall structure containing one meeting room and two offices, with integrated sound board built into the walls and roof for noise reduction. The result was a quick office addition with noise reduction suited to the manufacturing environment.

From operating constraint to installed system.
Hiltz Propane needed additional office space within their existing facility without disrupting operations. Reynolds installed a 24'x20' modular in-plant office with climate control and full electrical, creating a professional workspace environment.
The constraint
24'x20' modular office space with integrated HVAC and electrical, providing private workspace within active propane distribution facility.
The Reynolds response
Modular In-Plant Office
The operational result
Documented outcome
What changed after the system went in.
- Rooms added
- 1 meeting room + 2 offices
- Climate control
- Climate Controlled
Per catalog.ts secondaryResults for this project.
Installation evidence
Inspect the actual project.
Every image below belongs to this published project record. Select an image to inspect it at full size.
Related project records
More work from Manufacturing
One local Reynolds team
Documents, storage, and modular space — planned together.
A project can begin with a file backlog, an access problem, or a constrained room. Reynolds can review the information, storage, and facility conditions together, then define the practical path.
Document systems
Scanning, workflow, records access, and information governance.
Explore the disciplineStorage systems
High-density systems, automated retrieval, shelving, and organized storage.
Explore the disciplineModular space
Mezzanines, in-plant rooms, enclosures, and facility structures.
Explore the disciplinePlan the next project
Discuss a modular buildings & mezzanines project like this.
Bring Reynolds the operating constraint. We will inspect the records, workflow, room, or facility and document practical options.
What happens next
- 01A Reynolds specialist reviews the request.
- 02We inspect the records, workflow, room, or facility.
- 03You receive practical options and a defined next step.



