
LVHN Carbon & Dickson City - Sterile & Clean Supply Storage
Wire shelving and louvered wall panels for new hospital sterile supply and clean supply areas across two LVHN facilities.
- System
- Storage Solutions
- Project site
- Lehighton, PA
The project, in one minute.
Lehigh Valley Hospital was building two new hospitals, LVH-Carbon and LVH-Dickson City, and needed sterile and clean supply storage that maximized capacity, kept materials easily accessible, and maintained proper controls. Reynolds designed and installed wire shelving units and wall-mounted louvered panels with wire baskets, with custom designs for each department. The result was optimized sterile storage with maximum capacity and proper controls across both facilities.

From operating constraint to installed system.
LVHN Carbon and Dickson City new hospitals required sterile and clean supply storage solutions designed for healthcare environments. Reynolds installed wire shelving systems with proper ventilation and louvered wall panels with baskets for organized, accessible supply management.
The constraint
Wire shelving and louvered wall panels for new hospital sterile supply and clean supply areas across two LVHN facilities.
The Reynolds response
Sterile & Clean Supply Storage
The operational result
Documented outcome
What changed after the system went in.
- Storage components
- Wire shelving units + wall-mounted louvered panels with wire baskets
Related project records
More work from Healthcare
One local Reynolds team
Documents, storage, and modular space — planned together.
A project can begin with a file backlog, an access problem, or a constrained room. Reynolds can review the information, storage, and facility conditions together, then define the practical path.
Document systems
Scanning, workflow, records access, and information governance.
Explore the disciplineStorage systems
High-density systems, automated retrieval, shelving, and organized storage.
Explore the disciplineModular space
Mezzanines, in-plant rooms, enclosures, and facility structures.
Explore the disciplinePlan the next project
Discuss a storage solutions project like this.
Bring Reynolds the operating constraint. We will inspect the records, workflow, room, or facility and document practical options.
What happens next
- 01A Reynolds specialist reviews the request.
- 02We inspect the records, workflow, room, or facility.
- 03You receive practical options and a defined next step.

